AfterHow Much Does Construction Cost in Federal Way?
Most construction in Federal Way runs between $9,000 and $130,000 for a single project, and a full accessory dwelling unit (ADU) build lands in the $90,000 to $220,000 range. A kitchen remodel typically costs $14,000 to $45,000, a bathroom remodel $9,000 to $28,000, and a home addition $45,000 to $130,000. Those are estimated 2026 ranges for the Federal Way market; your written estimate sets the final price.
We’re a residential construction and remodeling company, so we’re answering this the way we’d answer a neighbor who asked us over the fence. You’ll get real numbers, what moves them, and where Federal Way’s particular housing stock and building rules push a project one way or the other. Call (253) 216-8339 for a free estimate. We answer 24/7. Fast dispatch from 7am to 7pm, Sunday through Friday.

Key Takeaways
- A full ADU build in Federal Way is the largest single line on this guide: $90,000 to $220,000.
- The three most common remodeling projects (kitchen, bathroom, flooring) usually fall between $9,000 and $45,000.
- Federal Way’s mid-century split-levels and 1990s subdivisions each bring their own layout costs. Knowing which one you own changes the number before any material is picked.
- Material brand matters more than most homeowners expect. A Cambria quartz counter and a stock laminate counter are not the same install or the same price.
- Free estimates. The written estimate, not this page, sets your final price.
Construction Cost Breakdown (2026)
Here’s how the main residential construction and remodeling categories price out in Federal Way this year. Treat each figure as a typical estimated range for a standard-scope project.
| Project type | Typical estimated cost |
|---|---|
| Kitchen remodel (full scope) | $14,000 – $45,000 |
| Small kitchen remodel | $9,000 – $20,000 |
| Cabinet installation | $4,000 – $13,000 |
| Countertop installation | $2,000 – $6,500 |
| Backsplash installation | $800 – $2,500 |
| Kitchen island installation | $3,000 – $10,000 |
| Bathroom remodel (full scope) | $9,000 – $28,000 |
| Small bathroom remodel | $5,000 – $12,000 |
| Walk-in shower installation | $4,500 – $12,000 |
| Tub-to-shower conversion | $3,500 – $10,000 |
| Shower replacement | $3,000 – $8,500 |
| Bathroom vanity installation | $800 – $3,000 |
| Flooring installation (per project) | Quoted per job |
| Interior & exterior painting | Quoted per job |
| Home addition | $45,000 – $130,000 |
| ADU construction | $90,000 – $220,000 |
| Garage conversion | $30,000 – $80,000 |
| Paver patio installation | $3,500 – $11,000 |
Flooring and painting scale directly with square footage, which is why those two stay on a per-job quote rather than a fixed range. We handle both in-house alongside kitchen and bathroom work, which matters for the number: when the same contractor sequences the tile, the trim, and the paint, you’re not paying a second trade to come back and touch up someone else’s work.
What pushes a project toward the top of its range? Moving plumbing or gas lines, adding structural beams, upgrading to quartz from laminate, or discovering that the wall you wanted out is load-bearing. What keeps it at the bottom? Keeping fixtures in place, choosing standard cabinet depths, and picking from a brand line that’s already stocked at the supplier you’re buying from. KraftMaid and Wellborn, for example, offer tiers that swing cabinet installation from $4,000 to $13,000 depending on which line you specify.

What Drives the Lead Range of $90,000 to $220,000?
The single biggest line on a large project is the ADU, and Federal Way allows backyard cottages and attached units under its zoning in many of the city’s single-family areas. An ADU at $90,000 to $220,000 reflects the full build: foundation work, framing, roof, electrical, plumbing, insulation, finish materials, and the permits that come with a second dwelling on one lot. Homeowners who only need separate living space, not a full second dwelling, often land closer to the $30,000 to $80,000 garage conversion figure instead. Those two categories aren’t interchangeable, and pricing one like the other is where budgets go wrong.
Home additions sit in the middle at $45,000 to $130,000. A two-story bump-out over an existing foundation costs less than a single-story addition that needs its own footing and roofline tie-in. If your addition is adding a primary bath or a second kitchen, add the relevant interior range on top of the shell cost.
What Affects Construction Pricing in Federal Way
- Housing era. Federal Way has a lot of 1960s and 1970s split-levels and ranch homes, plus 1990s-era subdivisions. Older homes often have aluminum wiring, undersized panels, or original galvanized plumbing that has to be brought current during a remodel. That scope is usually invisible until the walls open.
- Slope and drainage. Parts of Federal Way sit on hillsides that shed water fast. A patio, addition, or foundation repair on a sloped lot needs more site work than a flat-lot project, and that’s a real dollar line, not a line item we pad.
- Permits. Structural changes, additions, ADUs, and most electrical or plumbing relocations need a permit through the City of Federal Way. Permit cost and inspection timelines vary with scope. We factor them into the estimate; you should never be surprised by them later.
- Material brand and tier. Cambria, Silestone, and Caesarstone quartz cost more than laminate, and Kohler or Grohe fixtures cost more than builder-grade. You’re paying for the durability and warranty behind the name, not just the look.
- Scope sequencing. A kitchen that’s being done alongside a bathroom and flooring in the same run prices better than three separate projects, because mobilization, painting, and finish work collapse into one schedule.
- Layout complexity. A galley kitchen with a load-bearing wall to remove costs more than an open kitchen that just needs new surfaces. Small bathroom remodels often hit a similar wall: a $5,000 to $12,000 budget holds fine until you decide to move the toilet.
How to Save on Construction in Federal Way
The ways to save are mostly about sequencing and scope decisions, not haggling. Here’s what actually moves the number down.
- Bundle projects into one schedule. Kitchen, bath, flooring, and paint under one contractor saves the mobilization and touch-up costs that come from three separate trades. One contractor. Every finish.
- Choose materials you can actually get. Working with recognized brand partners (KraftMaid, Cambria, Schluter tile systems, James Hardie siding) usually means the material is available and the install qualifies for the manufacturer’s warranty. Custom or imported one-off materials cost more and can stall the schedule.
- Keep plumbing fixture locations where they are. Moving a sink or toilet adds rough-in labor. In a bathroom remodel, staying put can save a meaningful slice of the $9,000 to $28,000 range.
- Pick your big-ticket items first. Cabinets and counters anchor the kitchen budget and set the timeline. Lock those in before selecting the backsplash and hardware, which are smaller lines ($800 to $2,500 for backsplash).
- Get the estimate in writing. A written scope and written price protect both sides. Ask for one before any work starts. Our estimates are free: call (253) 216-8339.
If you’re comparing what different contractors quote, it’s worth reading remodeling Kent to understand how a single-scope contractor prices a project before you sign anything.
Why We Quote the Brands We Quote
We work with the brands you already trust. In the kitchen, that means KraftMaid and Wellborn cabinetry – two of the most specified cabinet lines in professional remodeling – paired with Cambria, Silestone, or Caesarstone quartz. In the bath, that’s Kohler, Grohe, Toto, Moen, Delta, Blanco, and American Standard. On the exterior and tile side, it’s James Hardie fiber cement and Schluter tile systems. Our technicians have up to 15 years of experience, and they install to manufacturer specifications, which is what keeps those product warranties valid.
When we quote a project, the material line reflects a real brand and a real product category, not a generic allowance. That’s the difference between a quote you can compare and a quote that balloons later. From the first fixture choice to the final coat of paint, you’re working with one point of contact, so nothing gets handed off to a trade that never saw the plan.
FAQs – Construction Cost
How much does a kitchen remodel cost in Federal Way?
A full kitchen remodel in Federal Way typically runs $14,000 to $45,000, and a smaller or partial kitchen remodel runs $9,000 to $20,000. Cabinet installation alone is $4,000 to $13,000, countertops $2,000 to $6,500, and an island $3,000 to $10,000. Call (253) 216-8339 for an exact quote – estimates are free.
How much does a bathroom remodel cost in Federal Way?
A typical bathroom remodel in Federal Way costs $9,000 to $28,000, while a smaller bathroom lands around $5,000 to $12,000. A walk-in shower installation is $4,500 to $12,000, a tub-to-shower conversion is $3,500 to $10,000, and a vanity is $800 to $3,000. Call (253) 216-8339 for an exact quote – estimates are free.
Is it cheaper to build an ADU or add a room?
A home addition is usually cheaper: $45,000 to $130,000 versus $90,000 to $220,000 for a full ADU. An ADU carries its own foundation, utilities, and separate dwelling requirements, which is why it costs more. A garage conversion at $30,000 to $80,000 can split the difference if you don’t need a separate structure. Call (253) 216-8339 for an exact quote – estimates are free.
How does Federal Way’s housing stock affect my project cost?
It can push a project to the top of its range. Federal Way’s 1960s and 1970s homes often have wiring, plumbing, or panel work that has to be brought current during a remodel, and that scope is usually discovered when walls open. Homes from later decades tend to have fewer surprises. Call (253) 216-8339 for an exact quote – estimates are free.
Can you come today?
We answer 24/7 and dispatch Sunday through Friday, 7am to 7pm, so same-day estimates are often possible for projects we can scope quickly. A full construction or ADU plan usually needs a scheduled walkthrough rather than a same-day visit. A call outside dispatch hours is booked into the next opening. Call (253) 216-8339 for an exact quote – estimates are free.
Do construction projects in Federal Way need a permit?
Most structural changes, additions, ADUs, and any work relocating electrical or plumbing service do. Permit cost and inspection timelines depend on scope, so confirm the requirement with the City of Federal Way before work starts. We build permit costs into the written estimate rather than treat them as an afterthought. Call (253) 216-8339 for an exact quote – estimates are free.
Construction pricing in Federal Way runs the full spectrum, from a $9,000 small bathroom project to a $220,000 ADU, and the number always comes down to scope, material brand, and what the walls reveal. The way to pin it down is a walkthrough and a written estimate, both of which are free. Let’s talk your project through and get you a real number you can budget against.
Call (253) 216-8339 for a free estimate. We answer 24/7. Fast dispatch from 7am to 7pm, Sunday through Friday.
Written by the team at Remodeling Kent.
Pricing reflects the Federal Way market as of 2026. Remodeling Kent offers free estimates – call (253) 216-8339.
What Our Customers Say
"He caught an error in the engineer's drawings before it got framed, which would have been an expensive thing to discover later."
- Steve Schaefer"Allowances in the contract were realistic rather than artificially low to make the bid look good."
- Megan Vaughn"Quality construction and a professional operation. Communication was strongest at the site meetings, and slower by email in between."
- Kevin Mercer