







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterHow Much Does Construction Cost in Burien?
Most full-scale construction projects in Burien, WA land between $90,000 and $220,000 in 2026, with ADU construction and major home additions sitting at the top of that band. A kitchen remodel typically falls between $14,000 and $45,000, a bathroom between $9,000 and $28,000, and smaller updates like a vanity or a fresh coat of interior paint cost far less. Every figure we quote is an estimate; the written estimate we prepare after walking your home sets the final price.
Construction pricing in Burien is genuinely local. King County permitting runs through the city’s own building department, older housing stock around the Ambaum Boulevard corridor often hides surprises behind walls, and the short building season between wet months compresses installer schedules. We work with you on a scope that fits your budget, and we tell you straight when a number is a placeholder that will change once the walls are open.
Key Takeaways
- Full construction and major additions in Burien: $90,000 – $220,000 typical.
- ADU construction: $90,000 – $220,000. Garage conversions: $30,000 – $80,000.
- Kitchens range from $9,000 for a small update to $45,000 for a full remodel.
- Bathrooms run $5,000 – $28,000 depending on footprint and fixtures.
- Free estimates, no charge for the walkthrough. Call Remodeling Kent at (253) 216-8339.

Construction Cost Breakdown (2026)
Here are the typical estimated ranges for the work we handle across Burien. These are planning numbers, not bids. A 1950s rambler near Seahurst and a newer build close to Burien Town Square can carry the same scope on paper and still land at different prices once we see the framing, plumbing, and electrical conditions.
| Project Type | Typical Estimated Range |
|---|---|
| Full construction / major addition (lead range) | $90,000 – $220,000 |
| ADU construction | $90,000 – $220,000 |
| Home addition | $45,000 – $130,000 |
| Garage conversion | $30,000 – $80,000 |
| Kitchen remodel | $14,000 – $45,000 |
| Small kitchen remodel | $9,000 – $20,000 |
| Cabinet installation | $4,000 – $13,000 |
| Countertop installation | $2,000 – $6,500 |
| Backsplash installation | $800 – $2,500 |
| Kitchen island installation | $3,000 – $10,000 |
| Bathroom remodel | $9,000 – $28,000 |
| Small bathroom remodel | $5,000 – $12,000 |
| Walk-in shower installation | $4,500 – $12,000 |
| Tub-to-shower conversion | $3,500 – $10,000 |
| Shower replacement | $3,000 – $8,500 |
| Bathroom vanity installation | $800 – $3,000 |
| Flooring installation (by project) | Quoted per job |
| Interior & exterior painting (by project) | Quoted per job |
| Roof replacement | $8,000 – $20,000 |
| Roof repair | $400 – $1,800 |
| Metal roof installation | $15,000 – $40,000 |
| Tile roof repair | $600 – $2,500 |
| Window replacement | $4,500 – $15,000 |
| Concrete driveway installation | $4,500 – $12,000 |
| Paver driveway installation | $7,000 – $18,000 |
| Asphalt driveway paving | $3,500 – $9,000 |
| Driveway replacement | $5,000 – $14,000 |
| Driveway sealing | $250 – $700 |
| Paver patio installation | $3,500 – $11,000 |
| Vinyl fence installation | $3,500 – $9,000 |
| Aluminum fence installation | $4,000 – $10,000 |
What pushes a project toward the top of its range? Structure and systems. Moving a load-bearing wall, rerouting plumbing, upgrading an electrical panel to carry a new induction range, or discovering galvanized supply lines behind a bathroom wall all add cost. What keeps a project at the low end is keeping fixtures and plumbing in their current locations and choosing materials that are in stock. We pay close attention to this during estimates because a realistic opening number prevents the bad surprise later.
Material choice is the other lever, and it’s the one most homeowners have real control over. A kitchen with KraftMaid or Wellborn cabinetry and a Cambria quartz countertop reads very differently from one with stock cabinets and laminate. Both can work. Your budget should decide which direction the project goes before a single box is ordered.
What Affects Construction Pricing in Burien
Burien has a specific set of conditions that shape what construction costs here compared with neighboring cities. These are the factors that come up on nearly every estimate we prepare.
- Housing stock age. Much of Burien was built in the mid-20th century, and homes from that era frequently carry the original wiring, cast-iron drains, or a converted garage that was never permitted. Opening walls in these homes almost always reveals something that needs to be corrected before the new work goes in.
- Permitting through the City of Burien. Structural changes, additions, ADUs, and garage conversions all require permits. The cost of the permit itself and the time spent in review are part of the project budget. We factor this into the estimate from the start rather than arriving at a surprise later.
- Foundation and grade conditions. Burien’s lots vary from flat to significantly sloped, particularly in the hillside neighborhoods west of Ambaum. Sloped lots add cost for excavation, retaining, and foundation work on additions and ADUs.
- Wet-season scheduling. The Pacific Northwest building season is compressed. Exterior work (roofing, siding, driveways, additions) is best scheduled with weather in mind, and that can affect when the project starts and how long it takes.
- Scope overlaps. A kitchen remodel that also moves a bathroom wall or includes exterior painting costs more than the sum of those jobs done separately would suggest, but doing them together under one contractor usually saves more than it adds. Fewer scheduling gaps, one permit cycle, one accountable team.
- Material grade. Cabinet brand, countertop material, tile selection, and fixture brand are the biggest controllable variables in a kitchen or bath. Our role is to guide that selection so you get durability and design consistency rather than paying a premium for a brand name that doesn’t serve your space.

What Full-Scope Construction Includes in Burien
A full-scale construction project touches more trades than most homeowners expect. When we take on a project, we handle the interior scope that most remodeling companies have to subcontract out: kitchen remodeling, bathroom remodeling, flooring installation, and both interior and exterior painting. That matters for schedule and accountability. Finish work is the most common place projects run long, because it sits at the end of the chain and every preceding delay pushes it further out. Keeping painting and flooring inside the same contract means one team controls the timeline rather than two separate schedules that don’t talk to each other.
From the first fixture choice to the final coat of paint, the work is ours. That’s the structure we’ve built the business on, and it’s why our technicians have up to 15 years of experience working in King County homes.
Material Choices That Affect Your Estimate
The single most useful thing you can do before requesting an estimate is to have a rough idea of your material direction. The gap between a stock vanity and a Kohler or Grohe fixture package is real in both cost and longevity. We work through those decisions with you as part of the estimate process, not after.
- Cabinetry. KraftMaid and Wellborn are two of the most widely specified cabinet lines in professional kitchen remodeling, and both carry manufacturer warranties that depend on proper installation. We install to their specs so the warranty applies.
- Surfaces. Cambria, Silestone, and Caesarstone are the quartz brands we work with most often. Countertop installation for a typical kitchen lands between $2,000 and $6,500 depending on linear footage and edge profile.
- Plumbing fixtures. Kohler, Moen, Grohe, Delta, Toto, Blanco, and American Standard all cross our bench. Fixture brand affects both the unit cost and the installation labor in ways that are sometimes counterintuitive. A heavier cast-iron tub, for example, adds structural considerations.
- Tile systems. For showers and wet areas we install with Schluter systems, which is what lets the finished waterproofing carry the manufacturer’s warranty.
- Exterior materials. James Hardie fiber cement is the standard we work to for siding on additions and exterior remodels. It’s specified because it performs in this climate, not because it’s easy to install.
You already know these brands. Our job is to tell you which ones are right for your specific space, your timeline, and your budget.
How to Save on Construction in Burien
There’s no trick to lowering construction costs. There are decisions, made early, that prevent money from leaking out later.
- Do the interior scope in one project, not two. Combining a bathroom remodel with flooring replacement and interior painting under one contract eliminates duplicate mobilization costs and scheduling gaps. It’s one of the easiest savings available.
- Keep plumbing and electrical rough-in where it already is. Moving a toilet or relocating a gas line is expensive. A layout that works within the existing rough-in still feels new when the finishes are right.
- Choose mid-range on items you’ll rarely notice, name-brand on items that bear weight. Cabinet hardware, for example, is a fraction of the budget and doesn’t affect durability. Cabinet boxes and drawer glides do. Spend there.
- Get the permit scope right the first time. A permitted project that gets inspected cleanly costs less than one that has to be corrected mid-build. We plan the inspection schedule into the estimate from day one.
- Ask for a written scope you can compare. A written estimate tells you exactly what’s included and what isn’t. That’s how you avoid the low-bid trap where the number looks good until the change orders arrive.
The estimate is free. Call (253) 216-8339 to schedule a walkthrough. We answer 24/7. Fast dispatch from 7am to 7pm, Sunday through Friday.
How Weather and Season Affect Construction Timeline in Burien
Burien’s wet season shapes when exterior work can happen, and that affects the overall project calendar for additions, ADUs, roofing, and exterior painting. Interior work is less weather-sensitive, but material delivery and the availability of installers during the dry months can still push scheduling. Planning an exterior project for the wetter months means building in weather contingency, which adds time rather than money. Planning it for the drier windows means moving faster. We’ll tell you honestly what a realistic timeframe looks like for your specific project and where the weather risk sits.
The most important thing is to start the conversation early. Projects that begin their planning in the winter are ready to break ground when the weather cooperates.
FAQs – Construction Cost in Burien
How much does a typical construction or remodeling project cost in Burien in 2026?
Most full-scope projects land between $90,000 and $220,000, with ADUs at the top of that range and standard remodels in the $14,000 – $45,000 band for kitchens and $9,000 – $28,000 for bathrooms. Those numbers are estimates for planning; the written estimate sets the final price. Call (253) 216-8339 for a free estimate.
Is a home addition cheaper than an ADU in Burien?
A home addition typically runs $45,000 – $130,000, while ADU construction runs $90,000 – $220,000. Both require permits and both are site-sensitive. A single-story addition that shares a wall with the main house generally costs less than a detached ADU, which needs its own foundation, utilities, and access. Call (253) 216-8339 and we’ll scope both options against your lot.
What’s the most cost-effective way to remodel a kitchen in Burien?
Keeping the existing layout and upgrading finishes costs less than $9,000 – $20,000 for a small kitchen, while a full $14,000 – $45,000 remodel opens layout changes, cabinet relocation, and island additions. The most cost-effective single decision is to keep plumbing where it is. Call (253) 216-8339 for a free estimate on your specific kitchen.
Does a garage conversion cost less than an addition?
A garage conversion runs $30,000 – $80,000, which is below a $45,000 – $130,000 home addition. The shell and foundation already exist, so the main costs are insulation, mechanical, and finishes. Call (253) 216-8339 to see whether your garage is a good candidate.
How do I get an accurate construction estimate for my Burien home?
Start with a walkthrough. The range in this guide is a planning tool, not a bid. Site conditions, permit scope, and material choices determine the actual number. Call (253) 216-8339 to schedule a free estimate. We answer 24/7. Fast dispatch from 7am to 7pm, Sunday through Friday.
Call Remodeling Kent for a Free Estimate in Burien
Every project in this guide is real, and every dollar range is a starting point. The written estimate is where the actual number lives, and we prepare it at no cost. Whether you’re planning a full kitchen and bath remodel, a garage conversion, or an addition, we’ll walk the site with you, talk through the material choices (Cabinet brands, quartz, fixtures, tile), and give you a scope you can compare fairly against another contractor’s quote. We work with the brands you already trust so the finished result holds up. Call (253) 216-8339. We answer 24/7. Fast dispatch from 7am to 7pm, Sunday through Friday, for estimates and project scheduling. We’re closed on Saturdays.
Written by the team at Remodeling Kent.
Pricing reflects the Burien market as of 2026. Remodeling Kent offers free estimates – call (253) 216-8339.
What Our Customers Say
"He caught an error in the engineer's drawings before it got framed, which would have been an expensive thing to discover later."
- Steve Schaefer"Allowances in the contract were realistic rather than artificially low to make the bid look good."
- Megan Vaughn"Quality construction and a professional operation. Communication was strongest at the site meetings, and slower by email in between."
- Kevin Mercer












